79
PB
16
Wall Plenum Installation
B
Detail B
Step 3 - Inside Wall Plenum (cont.)
Note: Do not place any screws, fasteners, or penetrating holes through the top or bottom of the plenum
assembly.
1) Drill pilot holes on the interior of the inside plenum half (Part B) as show in Detail B. Pilot holes should be
located approxiamtely 4” from the top and bottom of the inside plenum half, on both the left and right sides.
2) Install fasteners through each pilot hole. Fastener must pass through both Part A and Part B. If the inside
and outside plenum halves do not overlap at fastening point, be certain to drill extra holes where needed to
secure both Part A and Part B to the rough opening.
INSTALLATION
Wall Plenum Installation 12 & 24k
Summary of Contents for VRP12K
Page 46: ...46 OPERATION Component Identification Indoor Coil 36k ...
Page 48: ...48 OPERATION Component Identification Outdoor Coil Monitored by 1 thermistor ...
Page 49: ...49 OPERATION Component Identification Outdoor Fan BLDC Variable Speed 600 1000 RPM ...
Page 53: ...53 OPERATION Component Identification 4 Way Reversing Valve 208 230v Reversing valve assembly ...
Page 177: ...177 UPDATING VRP FIRMWARE Or ...
Page 184: ...184 UPDATING VRP FIRMWARE Open zip file Copy to SD Card Insert into SD Card Slot ...
Page 193: ...193 UPDATING VRP FIRMWARE Retrieving VRP Data Remove SD Card from FMC and Locate DF Folder ...
Page 196: ...196 WIRINGDIAGRAMS 12 24K BTU 208 230V 7 5 10 0 KW Figure 801 Wiring Diagram ...
Page 197: ...197 WIRING DIAGRAMS 12 24K BTU 208 230V 2 5 3 4 5 0 KW Figure 802 Wiring Diagram ...
Page 198: ...198 WIRING DIAGRAMS 12 24K BTU 265V 2 5 3 4 5 0 kW Figure 803 Wiring Diagram ...
Page 199: ...199 WIRING DIAGRAMS 12 24K BTU 265V 7 5 10 kW Figure 804 Wiring Diagram ...
Page 200: ...200 WIRING DIAGRAMS 36K BTU 208 230V Figure 805 Wiring Diagram ...