background image

PATIO COVER INSTRUCTION SHEETS

[email protected]

PATIO COVER INSTRUCTION SHEETS

[email protected]

C

D

E

F

G

Having the 

Next Panel Unwrapped… repeat Step 4-E&F

Keep ROOF PANEL 4" away from first panel 

and slide it all the way into the ROOF HEADER 

Person #1 stands by the first post to hold it steady

while 

person #2 is on ladder chest

high with roof panel.

Person #2 counts "1,2,3 PUSH" then 

Pushes the Roof Panel

"medium Hard" 

to lock into the first panel…person #1 will be bracing the post for the impact of the panels locking 
together

Look at the Bottom Seam 

of the two locked panels … up to a 

1/8" Seam Gap is Normal

.

If the Gap is larger, then 

carefully push 

the panel more…. to close the seam tighter.

BE CAREFUL not to dent 

the panel when pushing…

NOTE: CHECK EVERY SEAM AFTER PANELS ARE LOCKED BEFORE FASTENEING

Then 

Fasten through Top of Roof Header downward

into the panel with one #10 tek screw 

keeping 

4 inches away from the male panel edge 

1inch back from the front edge of Roof 

Header Leg

Person #1 

checks FIRST Post SIDES to be Plumb Level 

then person #2 Uses a hammer to tap a 5" 

long Tek screw with washer through the top of roof panel until it hits the beam…STAY 4 INCHES 
AWAY FROM MALE EDGE... 

Fasten the 5" screw into beam 

until washer hits top side of panel. DO 

NOT fasten too tightly as it will interfere with the next roof panel locking into it.

NOTE:THE SQUARE DOES NOT NEED TO BE USED ANYMORE.  AFTER EVERY OTHER 
ROOF PANEL IS FASTENED, CHECK A POST TO BE PLUMB LEVEL ON THE SIDE OF THE 
POST 

(not the front or back)… 

IF NEEDED GIVE THE POST & BEAM ASSEMBLY A PUSH IN 

THE NEEDED DIRECTION TO GET THE POST PLUMB LEVEL.

REPEAT STEPS 5-A,B,C,D,E,F until there is one roof panel left 

to put up.

LifeRoom ONE Installation Guide

Summary of Contents for LifeRoom ONE

Page 1: ...LifeRoom ONE Installation Manual www fourseasonsols com support fourseasonsols com 800 533 0887...

Page 2: ...TABLE OF CONTENTS LifeRoom ONE Roof Frame page 3 LifeRoom ONE Sidewall Framing page 26 LifeRoom ONE Screen page 30 www fourseasonsols com support fourseasonsols com 800 533 0887...

Page 3: ...PATIO COVER INSTRUCTION SHEETS support FourSeasonsOLS Com PATIO COVER INSTRUCTION SHEETS support FourSeasonsOLS Com LifeRoom ONE Installation Guide...

Page 4: ...PATIO COVER INSTRUCTION SHEETS support FourSeasonsOLS Com 3 5 2021 4 PATIO COVER INSTRUCTION SHEETS LifeRoom ONE Installation Guide...

Page 5: ...s ends if OPTION 2 mark on the wall the location of your wall studs Hold up the Roof Header B and transfer the marks of the truss ends or wall studs to the back side of the Roof Header near the top At...

Page 6: ...eader is fastened caulk around all the screw heads inside the header AND check top side and caulk spots if it did not squish out upward behind the Roof Header H2 G STEP 2A 3 EDGE Single Beam Preparati...

Page 7: ...ket I into both Edge Beams the Beam Splice G Rotate the beam over one time so the Top Post Bracket legs are up then fasten 2 two 14x1 1 4 tek screws into each 3 Edge Beam 4 total Rotate the beam one t...

Page 8: ...sing 4 14 tek screws 2 on each side 6 Setback Brackets should now be fastened to the 3 Edge Beam Measure between the Top Post Brackets and mark the midpoint on the 3 Edge Beam Center the Setback Brack...

Page 9: ...lower than 80 inches Place a Level on Front Edge of slab to determine which is the LOW Side the left side or the right side After determining the LOW Side measure from slab up to the bottom of the Ro...

Page 10: ...g using 4 four 14 x 1 1 4 tek screws evenly spaced on both sides Place a Ladder at the first End Post for Person 1 place second ladder near the opposite end for person 2 Stand up the attached Post and...

Page 11: ...g posts Laydown the Edge Beam and Post Assembly Insert the Bottom Post Bases K into the bottom of each Post J Fasten through the side of posts into the internal legs of the bottom base with 4 four 14...

Page 12: ...Mark post locations out from house wall for the first and last post then pop a chaulkline connecting the first and last marks These post measurements are critical for future installation of Rolldown...

Page 13: ...r a towel and set on top of beam to protect roof panels from scratching Slide the gutter end of panel over the 3x3 Edge Beam then slide Roof Header end of panel into the Roof Header until it hits Set...

Page 14: ...b level REMOVE THE CARDBOARD Then Use a hammer to slowly drive a 5inch tek screw with washer SLOWLY through the top skin of ROOF PANEL until it hits the BEAM keeping it 4 inches away from MALE edge of...

Page 15: ...ns drill a 3 8 hole through the Bottom Post Bracket K into the slab and insert the WEDGE ANCHORS and tighten Repeat for each post Carefully unwrap the next roof panel look for any dents turn panel so...

Page 16: ...CHECK EVERY SEAM AFTER PANELS ARE LOCKED BEFORE FASTENEING Then Fasten throughTop of Roof Header downward into the panel with one 10 tek screw keeping 4 inches away from the male panel edge 1inch back...

Page 17: ...ight overhang the 3x3 FRONT EDGE BEAM and the ROOF HEADER slightly that is OKAY it will get covered up by the EXTRUDED FASCIA E Take one piece of Extruded Gutter D and the Gutter Splice C Measure the...

Page 18: ...he screw threads inside the Gutter Splice Caulk the LEFT edge of the Gutter Splice gutter bottom and up the sides smooth it out Measure the Length of Extruded Gutter D Transfer that measurement to TOP...

Page 19: ...D at the end of the Gutter Splice C Slowly push the gutter onto the Roof Panels and slide to the LEFT over the Gutter Splice until the two gutters butt together Align the two Gutters for a good fit m...

Page 20: ...eeded for a better fit Push the fascia on the roof panel slide it against the house end Fasten the Fascia E through the top leg into the roof panel using 1 one 10 tek screw Take Second piece of Fascia...

Page 21: ...t End of Patio Cover and repeat STEPS 7 A to F NOTE you will need a 1 1 2 to 2 1 8 hole saw Line up your Scupper Drain Holes typically centered with the First and Last Posts Drill your holes using the...

Page 22: ...f Roof Header B and the Roof Panel If Sealant at Roof Seams did not Squish up go ahead and Caulk over the Roof Seams where it is needed DO NOT WALK ON Roof Seams Caulk around cover the TOP Screws of F...

Page 23: ...KING SEALANT MUST BE CURED FOR 24 HOURS BEFORE YOU CAN INSTALLTHE PEEL n SEALTAPING ROOF MUST BE CLEAN DRY Wipe Off the Rear Leg of the Gutter on TOP of the ROOF and about 4inches of the Roof Panel Ho...

Page 24: ...oving Downward over the Gutter Leg and down into the Gutter Smooth out theTape as you move down toward the Gutter Smooth itTightly against the Sealant and Outward away from the Seams in Both Direction...

Page 25: ...PATIO COVER INSTRUCTION SHEETS support FourSeasonsOLS Com PATIO COVER INSTRUCTION SHEETS support FourSeasonsOLS Com Step 11 Flashing LifeRoom ONE Installation Guide...

Page 26: ...evel the Channel up the wall and mark the location on the wall Predrill holes in the Channel Caulk the back side of the channel and fasten to the house wall using 5 fasteners STEP 16 Remove the screws...

Page 27: ...l the 3x3 side beam Fasten through the side Beam into the hidden Post Bracket using 2 14 tek screws inside and outside At house wall fasten through the Receiving Channel into the Side Beam using 2 14...

Page 28: ...angle to fit Line up the angle flush with outside edge of the Side Beam and fasten using 8 tek screws spaced every 16 b b Cut the short piece of the 1x1 angle for the short 3x3 Post in the Receiving C...

Page 29: ...and mark measurements onto the 2 Filler Panel Cut the Filler Panel with a skillsaw fitted with a carbide tip blade Test fit it and push it into the opening LifeRoom ONE STEP 20 Measure fit and fasten...

Page 30: ...LifeRoom ONE Screen Installation Guide www fourseasonsols com support fourseasonsols com 800 533 0887 LifeRoom ONE Installation Guide...

Page 31: ...www fourseasonsols com support fourseasonsols com 800 533 0887 LifeRoom ONE What s Included WhatYou Need LifeRoom ONE Installation Guide...

Page 32: ...sonsols com support fourseasonsols com 800 533 0887 LifeRoom ONE STEP 1 Remove the screws as shown below from both sides of the hood assembly STEP 2 Remove the Cover and set aside LifeRoom ONE Install...

Page 33: ...e up the post as shown from the top of the floor post bracket not the floor to the bottom of the 3x3 beam STEP 4 Subtract 3 from the measurement you just made H and cut the Side Track Then subtract 3...

Page 34: ...www fourseasonsols com support fourseasonsols com 800 533 0887 STEP 5 Slide the Receiving Channels over the leg of the End Caps as shown LifeRoom ONE LifeRoom ONE Installation Guide...

Page 35: ...and Receiving Channels between the Posts of your LifeRoom ONE and push it up tight against the beam STEP 7 Make sure the Hood Assembly is facing upward and tight against the Beam Fasten through each...

Page 36: ...P 8 Push the Hood Assembly up tight against the 3 Edge Beam Then secure the Receiving Channels to each Post using self drilling screws Keep the bottom screw 5 up from the ground and then equally space...

Page 37: ...e Side Rails into the Receiving Channels as shown The Plastic Entry Guide should be on the top do not fasten the Rails yet STEP 10 Pull the Screen down into the Side Rails ensuring that the Zipper goe...

Page 38: ...lel with each other Minor Screen wrinkles are normal sunlight will typically help smooth them out STEP 12 Fasten theTrack to the Receiving Channel using 5 Self drilling Screws on each side Be sure not...

Page 39: ...lled down attach a fastener through the End Cap on both sides as shown below STEP 14 For 10 5 screens use 2 additional screws to fasten the hood upward to the 3 Edge Beam spaced into thirds For all ot...

Reviews: