PATIO COVER INSTRUCTION SHEETS
PATIO COVER INSTRUCTION SHEETS
B
C
D
E
F
G
Subtract 3-1/2 inches
from your measurement
AND *1/2" per ft
of your roof panels (*minimum) if
your roof panels are 10ft =
5"
… if roof panels are 12ft =
6”
*if you can get more pitch do it*
Example:
if you bought a 12ft deep x 22ft wide LifeRoom ONE:
and you measured
98
inches to the bottom of Roof Header -
98" - 3-1/2”
= 94-1/2”
then 94-1/2" - 6" = 88-1/2”)
Example
= Cut your first post to 88-1/2 inches long
Slip YOUR first post tightly over the
Top Post Bracket(I
)
fasten through the post into the internal bracket leg
using
(4) four #14 x 1-1/4" tek screws
evenly spaced
on both sides
Place a Ladder at the first End Post for Person #1.
place second ladder near the opposite end for person
#2. Stand up the attached Post and Front Edge Beam assembly while person #2 is holding the Front
Edge Beam LEVEL & holding a POST against the Edge Beam
Person #1 tells person #2 to
Raise or Lower
the
3x3 Edge Beam to get it level.
When it is level,
person #2 will Mark along the bottom to the beam onto the post.
Cut the post under the line
marked. Repeat STEP "3-D"
to
fasten
the
Post(#J)
to the
Edge Beam(#F)
Using ladders and or your building buddies, hold the assembly of the 2 posts and Edge Beam upright.
Then double check to
make sure the Edge Beam is LEVEL
. If it is not LEVEL, then cut one of your
posts to make that adjustment.
LifeRoom ONE Installation Guide