![Fortress Building Products FortressAccents Installation Instructions Manual Download Page 19](http://html1.mh-extra.com/html/fortress-building-products/fortressaccents/fortressaccents_installation-instructions-manual_2322382019.webp)
19
FORTRESSACCENTS INSTALLATION: PLUG AND PLAY
Step 3:
Connect Light Wire To LED Vertical Post Light Wire
1. Connect wires by using a FA - PNP Female-To-Female
Connector. As shown in Fig. 35. Wire connections can
also be made below the deck surface.
Fig. 35
FA - PNP
Female-Female
Connector
Step 4:
Install LED Post Vertical Post Light Cover
1.
Tuck wires inside post cutout.
2. Place LED Vertical Post Light Cover over the installed LED
Vertical Post Light Base and slide downward until cover is
fully in place.
3. Turn on the Smart Controller (if applicable) to turn on the
lights and verify that the wiring is correct.
4. Using the two supplied machine screws, secure the cover
to the base. As shown in Fig. 36.
Tip:
• If using Smart Controller, reference pages 27 - 30
for Tuya
Smart app pairing process.
• If not using Smart Controller, lights can be turned on by
plugging transformer plug into GFCI Outlet.
Fig. 36