
16
FORTRESSACCENTS INSTALLATION: PLUG AND PLAY
INSTALLATION (METAL POST): LED GLOW RING
Step 1:
Install Post Cap Base
1. Mount the Post Cap Base onto the post. As shown in
Fig. 27.
2. Reference step 2 “Mount Post Cap Base” on pages 12 & 13
for instructions on how to secure the Post Cap Base to the
Post.
3. Remove the Insect Screen from the FortressAccents Post
Cap Base. As shown in Fig. 28.
Note:
• An LED
Glow Ring and LED
Cap Light Kit can be installed
together in the same FortressAccents Flat Pyramid Cap for
cap sizes greater than 2” [51mm].
Fig. 27
Step 2:
Connect Light Wire To LED Glow Ring Wire
1. Connect wires by using a FA - PNP Female-To-Female
Connector. As shown in Fig. 29. Wire connections can
also be made below the deck surface.
2. Once connected, tuck excess wires into post.
Fig. 29
Fig. 28
FA - PNP
Female-To-Female
Connector