www.fmiproducts.com
125898-01D
13
VENTING INSTALLATION
Continued
5.
Position
horizontal vent cap in center of the 8
1
/
2
"
round hole and attach to exterior wall
with four wood screws provided. Before
attaching vent cap to exterior wall, run a
bead of non-hardening mastic (pliable
seal between it and outside wall.
Note: Four wood screws provided should
be replaced with appropriate fasteners for
stucco, brick, concrete or other types of
sidings (see Figure 10).
For vinyl
siding, stucco or wood exteriors, a siding
standoff may be installed between vent
cap and exterior wall. Siding standoff
prevents excessive heat from damaging
siding materials. Siding material must be
cut to accommodate standoff. Bolt vent
cap to standoff. Apply non-hardening
mastic around outside edge of standoff.
Position standoff/cap assembly in the
center of 11
1
/
2
" square hole and attach to
exterior wall with provided wood screws
6.
pipe before connecting horizontal run to
Figure 10 - Installing Horizontal Vent Cap
(Noncombustible Exterior)
Wood
Screw
Vent Cap
Figure 11 - Installing Siding Standoff
(Combustible Exterior Wall)
Cut Siding Away to
Fit Standoff
Wood
Screw
Screws
Standoff
Vent
Cap
Apply Mastic
to All Four Sides
Vent Cap
(Horizontal
Interior Wall
Surface
Wall
Firestop
Horizontal
Vent Pipe
Figure 12 - Connecting Vent Cap with
Horizontal Vent Pipe
Screw
Apply
Mastic to All
Four Sides
-
sembly attached, toward wall and insert
vent pipe into horizontal termination. Pipe
overlap should be a minimum of 1
1
/
4
" (see
surface and attach with screws provided.
See Figure 13, page 14, for horizontal
termination details.
noncombustible material if needed. Nail or
unit in place.
IMPORTANT:
-
is not level it will not work properly.