![Fluke BP Pump 2 Operators Operator'S Manual Download Page 62](http://html1.mh-extra.com/html/fluke/bp-pump-2-operators/bp-pump-2-operators_operators-manual_2310045062.webp)
BP Pump 2
Operators Manual
3-26
2.
If the Leak Rate is unsatisfactory, repair the possible cause of the leak and
press
START
again to repeat the test.
3.
Press the
NEXT>
key to advance to the next test. Only the leak rate displayed
when the
NEXT>
key is pressed appears on the printout.
Note
The
NEXT>
key will not function until the Leak Test has been performed
at least once.
Relief Valve Test
This test increases the pressure in the pneumatic system until the relief valve on
the NIBP monitor opens or until the Setpoint is reached, whichever occurs first.
1.
Press the
START
soft key to initiate this test. It is recommended that this test
be repeated multiple times.
2.
Press the
NEXT>
key to advance to the next test.
Note
The
NEXT>
key will not function until the Relief Valve Test has been
performed at least once.
Pressure Source
This test causes the system to rise to the Setpoint pressure, which was defined
when the auto sequence was edited.
1.
Press the
START
soft key to initiate this test. The system then begins to
pressurize until a stable pressure reading at or near the Setpoint is reached.
2.
Record the monitor reading on the data sheet (if generated).
3.
Press the
NEXT>
key to advance to the next test.
Note
The
NEXT>
key does not function until the Pressure Source test has been
performed.
Summary of Contents for BP Pump 2 Operators
Page 6: ......
Page 10: ...BP Pump 2 Operators Manual iv...
Page 12: ...BP Pump 2 Operators Manual vi...
Page 14: ...BP Pump 2 Operators Manual 1 2...
Page 26: ...BP Pump 2 Operators Manual 2 2...
Page 38: ...BP Pump 2 Operators Manual 3 2...
Page 68: ...BP Pump 2 Operators Manual...
Page 74: ...BP Pump 2 Operators Manual B 4...
Page 82: ...BP Pump 2 Operators Manual D 6...