![Fluke BP Pump 2 Operators Operator'S Manual Download Page 46](http://html1.mh-extra.com/html/fluke/bp-pump-2-operators/bp-pump-2-operators_operators-manual_2310045046.webp)
BP Pump 2
Operators Manual
3-10
Note
Put the NIBP monitor in “Calibrate” or “Service” mode to close the vent
valve, allowing the Tester to inflate the pneumatic system. Refer to the
NIBP monitor’s service manual to find the method for entering “Service”
mode.
To assess the effectiveness of the relief valve, do the following:
1.
Use the soft keys to follow the menu path shown below.
PRESSURE TESTS
C
PRESSURE RELIEF
C
SETUP
The
Relief Valve Test (Setpoint)
screen appears.
Relief
V
al
v
e Test
Setpoint: 3
8
0
mm Hg
fas02.eps
2.
If necessary, adjust the Setpoint, which defaults to 380 mmHg, by entering
numbers with the number keys. The cursor moves to the next position after a
number is entered.
3.
Press
ENT
to display the
Relief Valve Test
screen.
Relief
V
al
v
e Test
SETUP
V
E
N
T
<START>
Peak : _._ _
Setpoint : 3
8
0
Meas
u
red : 0
mm Hg
mm Hg
mm Hg
fas03.eps
4.
Press the
VENT
soft key to release any unwanted pressure in the system
before performing the test. This feature vents the system for approximately
five seconds and can be repeated as needed to return pressure to zero.
5.
Press the
<START>
soft key to make the Tester deliver air to the system.
While the Tester is delivering air to the system, the current pressure
(Measured) and peak pressure are being monitored.
If the Setpoint is reached and the monitor does not release the pressure, the
message
No Relief Detected
appears on the display.
Summary of Contents for BP Pump 2 Operators
Page 6: ......
Page 10: ...BP Pump 2 Operators Manual iv...
Page 12: ...BP Pump 2 Operators Manual vi...
Page 14: ...BP Pump 2 Operators Manual 1 2...
Page 26: ...BP Pump 2 Operators Manual 2 2...
Page 38: ...BP Pump 2 Operators Manual 3 2...
Page 68: ...BP Pump 2 Operators Manual...
Page 74: ...BP Pump 2 Operators Manual B 4...
Page 82: ...BP Pump 2 Operators Manual D 6...