Operation
Pressure
Tests
3
3-9
Note
Once defined, the Setpoint can be changed in increments of 1 least
significant digit (LSD).
3.
Press
ENT
to display the
Leak Test
screen.
Leak Test
C
u
ff: External
CUFF
SETUP
V
E
N
T
<START>
Leak Rate: _._ _
Setpoint: 250
Meas
u
red: 0
fas01.eps
4.
Press the
VENT
soft key to release any unwanted pressure in the system
before performing the test. This feature vents the system for approximately
five seconds and can be repeated as needed to return pressure to zero.
5.
Press the
<START>
soft key to make the Tester deliver air to the system.
Once the system under test reaches the target pressure, the test begins. The
pressure leak rate of the system and the current system pressure are shown
during the test. The leak rate is expressed in mmHg/min by default or can
appear in kPa/min, cmH
2
O/min, inH
2
O/min, or psi/min, depending on the
pressure measurement unit selection. The leak rate of the Tester is < 2
mmHg/minute.
Note
When testing with an NIBP monitor in the system, it is necessary to put
the monitor in “Service” mode, because most monitors leave the system
open to the atmosphere.
6.
Press
HOME
to return to the
Main
menu.
Pressure Relief Test
The Pressure Relief Test increases the pressure in the pneumatic system until the
relief valve on the NIBP monitor opens, or until the Setpoint is reached, whichever
occurs first.
Summary of Contents for BP Pump 2 Operators
Page 6: ......
Page 10: ...BP Pump 2 Operators Manual iv...
Page 12: ...BP Pump 2 Operators Manual vi...
Page 14: ...BP Pump 2 Operators Manual 1 2...
Page 26: ...BP Pump 2 Operators Manual 2 2...
Page 38: ...BP Pump 2 Operators Manual 3 2...
Page 68: ...BP Pump 2 Operators Manual...
Page 74: ...BP Pump 2 Operators Manual B 4...
Page 82: ...BP Pump 2 Operators Manual D 6...