71
Flowserve US Inc.
SIHI
dry
dry
dry
dry
Standard
Standard
Standard
Standard M Series
Dry Running Vacuum Pump
Issue Date: November 21, 2016 Copyright:
FLOWSERVE SIHI Pumps Rev 1
•
Prior to assembly, clean all the parts of the vacuum pump to be assembled, paying particular
attention to the sealing surfaces. While cleaning, check whether the sealing surfaces show signs of
wear.
•
During assembly, it is essential to ensure that no foreign bodies enter the interior of the pump.
•
When completing the electrical connections, observe the circuit diagram enclosed in order not to
put the functional and operating safety of the pump or unit at risk.
•
All seals exposed must be renewed.
•
Prior to assembly, ensure all the necessary tools and devices are available.
10.5.2.1 Assembling the discharge orifices
1. Insert a new O-ring (41.23) in the slot of
the discharge orifice (15.60) and fix the
discharge orifice to the motor housing
(10.40) using the 4 hexagon screws M12
(90.13) and washers (55.41).
Torque M12: 65lb ft [87 Nm]
Summary of Contents for SIHI dry Standard H Series
Page 82: ......