32
6.3.2.
Before Getting Started
Follow the steps below before getting started:
CAUTION
: Before getting started, cut off the current to prevent an electric shock.
1.
Make sure to remove the security screw used to hold the counterweight during transport when
unpacking the cable management system.
2.
Install a cable management system on a new station OR install a cable management system on an existing
station by following the steps below:
6.3.2.1.
Before Installing a Cable Management System on a New Back-
to-Back Charging Station
1.
First, install the pedestal and charging station. Refer to the
Installing the Pedestal and Charging Station
section(
section
5
. ) of this guide for more information and the
CoRe+ MAX Installation Guide
as needed.
2.
Then, prepare the installation material for the cable management systems and follow the instructions in
the
Installing the Back-to-Back Cable Management System
section below.
OR
6.3.2.2.
Before Installing a Cable Management System on an Existing
Back-to-Back Charging Station
1.
Prepare the installation material for the back-to-back charging station mount brackets and cable
management systems and follow the instructions below.
Summary of Contents for CoRe+
Page 1: ...1 x Pedestal and Cable Management System Installation Guide TM ...
Page 8: ...8 3 1 2 Dimensions The image below shows the dimensions of the pedestal ...
Page 24: ...24 Measurements for the CoRe MAXon a Wall Mounted Installation ...
Page 47: ...47 9 2 Multiple Pedestals Multiple Devices on Separate Electrical Circuits Grounding ...