10
The conduits should be off-centered toward the door, with the outside of the conduits at a
minimum distance of 1.25’’ (32 mm) from the center of the anchor pins.
The 2 conduits must be placed side by side and centered between the anchor pins, which are
located on each side of the pedestal access door
.
Back-to-Back Conduit Positioning
Use these instructions for the
Back-to-Back (Stations on the Sides)
charging
station installation (see section
3.3.4.).
The conduit positioning should follow the guidelines below:
The conduits should be off-centered toward the door, with the outside of the conduits at a minimum
distance of 1.25’’ (32 mm) from the center of the anchor pins.
The 2 conduits must be placed back to back and be centered between the anchor pins, which are
located on each side of the pedestal’s access door
.
69.85 mm
[2.75"]
63.50 mm
[2.5
"
]
63.50 mm
[2.5
"
]
63.50 mm
[2.5
"
]
Ø
63.50
mm
[2.5
"
]
Access door side
90.00 mm
[3.5
"
]
25.40
mm
D
H
A
Summary of Contents for CoRe+
Page 1: ...1 x Pedestal and Cable Management System Installation Guide TM ...
Page 8: ...8 3 1 2 Dimensions The image below shows the dimensions of the pedestal ...
Page 24: ...24 Measurements for the CoRe MAXon a Wall Mounted Installation ...
Page 47: ...47 9 2 Multiple Pedestals Multiple Devices on Separate Electrical Circuits Grounding ...