5.
Connect the wires that will be used to connect the charging stations to their respective breakers,
being careful to keep the phases balanced (in the case of a tri-phase supply). Connect the ground
wires to the non-isolated (ground) terminal.
NOTE:
Refer to the stickers on the cascading kit mounting bracket for the proper wire connection
information.
6.
Install the breaker locks on the 100 A breakers of the cascading kit (part number ACPE001100). Follow
the steps below. Refer to the
Cascading Kit Breaker Locks
section if necessary.
i.
Place the breaker lock pin inside the breaker lock arm hole.
ii.
Place the pin on the breaker lock pivot notch.
iii.
Fix the breaker lock pivot to the double circuit breaker using the 2 screws provided (max.
torque: 8 LB-IN [0.9 NM]), making sure the pin stays between the notch and the breaker.
iv.
Place the breaker lock stopper against the upper stopper and fix them on the double circuit
breaker using the 2 screws provided (max. torque: 8 LB-IN [0.9 NM]).
v.
Repeat steps 1–4 for the second breaker lock.
7.
Install each charging station on the pedestal as per the CoRe+ MAX Installation Guide.
8.
Close the pedestal access door.
9.
Secure the access door according to regulations either by:
i.
Placing a padlock (not included) on the door latch opening;
ii.
Tightening the 2 tamper-resistant hex drive screws on the top of the access door.
NOTE
:
When using a padlock to secure the access door, the thumb screws can be used instead of the
tamper-resistant hex drive screws.
Summary of Contents for CoRe+
Page 1: ...1 x Pedestal and Cable Management System Installation Guide TM ...
Page 8: ...8 3 1 2 Dimensions The image below shows the dimensions of the pedestal ...
Page 24: ...24 Measurements for the CoRe MAXon a Wall Mounted Installation ...
Page 47: ...47 9 2 Multiple Pedestals Multiple Devices on Separate Electrical Circuits Grounding ...