![fisair Diphusair FL Series Manual Download Page 42](http://html1.mh-extra.com/html/fisair/diphusair-fl-series/diphusair-fl-series_manual_2294098042.webp)
Page 42
Function parameters (ctd.)
No. Parameter
No.
Meaning/Comment
[ ] explains the term in the glossary
min
max
FS
[ ] refers to a related explanation of the term
Assignment_main_relay
60
The blow-down pump is not actuated (M)
61
The blow-down pump is actuated (M)
62
A partial blow-down [21] is taking place (M)
63
A full blow-down [22] is taking place (M)
64
A dilution [23] is taking place (only for ELDB [77]) (M)
65
An overcurrent blow-down [24] is taking place (only for ELDB [77]) (M)
66
A max. level blow-down [25] is taking place (only for HKDB [78]) (M)
67
A standby blow-down [26] is taking place (M)
68
An additionally installed relay is to be actuated, which switches the input
solenoid valve for flushing the dead-leg line if the interlock (safety) system is
not closed (S)
69
A start blow-down [20] is taking place (M)
120
Power level [63] 1 of cylinder 1 is active (only for HKDB [78]) (S). If this
assigment was chosen ex-factory, no other assigment is possible.
121
Power level [63] 2 of cylinder 1 is active (only for HKDB [78]) (S). If this
assigment was chosen ex-factory, no other assigment is possible.
122
Power level [63] 1 of cylinder 2 is active (only for HKDB double cylinder units)
(S). If this assigment was chosen ex-factory, no other assigment is possible.
123
Power level [63] 2 of cylinder 2 is active (only for HKDB double cylinder units)
(S). If this assigment was chosen ex-factory, no other assigment is possible.
210
A downstream dehumidifier is to be actuated
[50] (S)
211
The value set in the Control 21 parameter (Humidity_notification) has been
reached (M)
270
A general service message is generated (M)
271
A service for one of the solenoid valves or the water supply line is required
272
A service for the blow-down pump is required (M)
273
A service is required after the steam volume counter which is relevant for the
service was reached (M)
274
A service is required after the max. operating cycles for K1 have been
reached (M)
275
A service is required after the max. operating cycles for K2 have been
reached (only for double cylinder units) (M)
276
A service is required after the max. operating cycles for K3 have been
reached (only for double cylinder units) (M)
277
A service is required after the max. operating cycles for K4 have been
reached (only for double cylinder units) (M)
278
A service is required after the max. operating cycles for K5 have been
reached (only for double cylinder units) (M)
17 Assignment_relay
1
Relay 1 is one of the top-hat rail relays connected to the ST10.1 connector
on the mainboard; assignment is same as for base relay
18 Assignment_relay
2
Relay 2 is the second of the top-hat rail relays connected to the ST10.2
connector on the mainboard; assignment is same as for base relay
19 Assignment_relay
3
Relay 3 is one of the top-hat rail relays connected to the ST10.2 connector
on the mainboard; assignment is same as for base relay
20 Assignment_relay
4
Relay 4 is the second of the top-hat rail relays connected to the ST10.2
connector on the mainboard; assignment is same as for base relay
see: 10-16 Assignment_main_relay
Selection
see: 10-16 Assignment_main_relay
Service_main_contactor K5
Selection
see: 10-16 Assignment_main_relay
Selection
see: 10-16 Assignment_main_relay
Selection
Service_blow-down_pump
Service_steam_amount_cnt.
Service_main_contactor K1
Service_main_contactor K2
Service_main_contactor K3
Service_main_contactor K4
Cylinder_2_step_1
Cylinder_2_step_2
Dehumidification
Humidity_reached
Collective_service
Service_solenoid_valve
Max._level_blow-down
Standby_blow-down
Dead_leg_flushing
Start_blow-down
Cylinder_1_step_1
Cylinder_1_step_2
Pump_off
Pump_on
Part._blow-down
Full_blow-down
Dilution
Max._current_blow-down
Adjustment/value range
Factory setting (FS) Bold