CIE-A-200 Control Panel Engineering and Commissioning Manual
63
Installation Checklist
Use the following checklist to ensure that your work is correct and that the commissioning engineer has the
necessary information to complete the commissioning of the system.
The commissioning eng
ineer will require this sheet, along with ‘Loop Continuity and Insulation Test Results’,
correctly marked ‘as-wired’ drawings and completed ‘Configuration sheets’, before attending site to
commission the system.
Stage 1
Description
Installation
Engineer Checked
Commissioning
Engineer Checked
LOOP 1
LOOP 1
Loop cable installed correctly, clipped or in
containment.
All loop bases and back boxes installed and
terminated.
All devices have positive core links in place.
Loop insulation and continuity testing complete, and
form filled out.
As-wired drawing marked up showing cable runs and
devices.
Configuration sheets completed with devices
descriptions etc.
Control Panel back box installed with 230v AC supply
live, tested and isolated locally.
Stage 2
Depending on the terms of your contract, you may also be required to carry out ‘Stage 2’.
Description
Installation
Engineer Checked
Commissioning
Engineer Checked
LOOP 1
LOOP 1
Devices installed into bases and back boxes.
Detector dust covers fitted.
Serial numbers noted on drawings and ‘Configuration
Sheets’.
Site Name & Address:
Installation Company:
Testing Engineer:
Signature:
Date: