![Festo IFB05-03 Manual Download Page 106](http://html1.mh-extra.com/html/festo/ifb05-03/ifb05-03_manual_2284204106.webp)
5. Diagnosis and error treatment
5−12
Festo P.BE−VIFB5−03−EN en 0503e
Starting the test routine
1. Switch off the operating and load voltage supplies (pins 1
and 2).
2. Open the node in accordance with chapter 3.2.1, Open
ing and closing the node".
3. Note the settings of the address selector switch and the
DIL switch elements.
4. Set address 99 and DIL switch elements 1...4 to OFF.
5. Switch on the power supplies (pins 1 and 2).
6. Set the desired test routine on the address selector
switches as follows:
Test routine
Address to be set
Parallel
0, 1 or 2
Serial
3
Fig.5/9: Setting the test routines
7. Start: Set DIL switch elements 1 and 2 to ON.
If faults occur when the test routine is started, the red LED on
the node will flash fast. The procedure must then be re
peated.
Summary of Contents for IFB05-03
Page 2: ......
Page 15: ...Summary of components 1 1 Festo P BE VIFB5 03 EN en 0503e Chapter 1...
Page 24: ...1 Summary of components 1 10 Festo P BE VIFB5 03 EN en 0503e...
Page 25: ...Fitting 2 1 Festo P BE VIFB5 03 EN en 0503e Chapter 2...
Page 35: ...Installation 3 1 Festo P BE VIFB5 03 EN en 0503e Chapter 3...
Page 63: ...Commissioning 4 1 Festo P BE VIFB5 03 EN en 0503e Chapter 4...
Page 95: ...Diagnosis and error treatment 5 1 Festo P BE VIFB5 03 EN en 0503e Chapter 5...
Page 126: ...5 Diagnosis and error treatment 5 32 Festo P BE VIFB5 03 EN en 0503e...
Page 127: ...Technical appendix A 1 Festo P BE VIFB5 03 EN en 0503e Appendix A...
Page 141: ...Accessories B 1 Festo P BE VIFB5 03 EN en 0503e Appendix B...
Page 146: ...B Accessories B 6 Festo P BE VIFB5 03 EN en 0503e...
Page 147: ...Index C 1 Festo P BE VIFB5 03 EN en 0503e Appendix C...
Page 148: ...C Index C 2 Festo P BE VIFB5 03 EN en 0503e Contents C Index C 1...