
4
Preparations for mounting
Festo – GDCP-EXCH-KM-KOMP-EN – 1506a – English
43
13.Push plug connecter of the proximity sensor into port
4
in the multi-pin plug distributor
(
è
Note
Observe mounting instructions of the proximity sensor.
14.Mount guide plate
7
of the energy chain with the screws (
è
Use screw locking agent Loctite 243.
Tightening torque 5.9 Nm.
15.Perform functional test of the proximity sensor.
16.Fasten cables between the energy chains with cable tie
9
for strain relief (
è
17.Mount the retaining plate
5
of the energy chain and the cover with the screws (
è
Tightening torque 1 Nm.