
4
Preparations for mounting
38
Festo – GDCP-EXCH-KM-KOMP-EN – 1506a – English
Assignment at the multi-pin plug distributor
1
2
3
4
5
6
7
Fig. 4.20
Connection
Function/assignment
1
Plug socket with cable for the solenoid valve
2
for end position
on top
of the connection component
3
for end position
underneath
the connection component
4
for slide units of the Y-axis
5
–
6
–
7
Multi-pin plug connection: plug socket with cable from the energy chain
1)
For variant with pneumatic attachment component (EXCH-…-P…)
2)
Optional (accessories)
Tab. 4.15