
5
Mounting (horizontal mounting position)
62
Festo – GDCP-EXCH-KM-KOMP-EN – 1506a – English
2. Loosen locking of the belt tensioning device.
EXCH-40
EXCH-60
Unscrew the 2 threaded pins.
Loosen the 4 socket head screws about 1 turn.
1
2
1
Threaded pin (2x)
2
Socket head screw M6x18 (4x)
Fig. 5.17
3. Change toothed belt pretensioning by evenly turning the 2 adjusting screws.
Observe the following note.
EXCH-40
EXCH-60
1
1
1
Adjusting screw (2x)
Fig. 5.18