![Festo CPX-FB38 Electronic Manual Download Page 89](http://html1.mh-extra.com/html/festo/cpx-fb38/cpx-fb38_electronic-manual_2284150089.webp)
2. Commissioning
2−53
Festo P.BE−CPX−FB38−EN en 0804NH
Proceed as follows
·
Check the DIL switch settings as well as the hardware and
network configuration before using and replacing the bus
node or CPX terminal.
·
Make sure that the desired parameterisation of the CPX
terminal is automatically carried out in the start−up"
phase, that is, during initialisation (EtherCAT status
Initialisation), (see section 2.6.2).
Please note
Perform configuration and parameterisation again after a
module replacement!
Recreate the necessary hardware and network configur
ation and CPX terminal parameterisation after replacement
of the bus node or CPX terminal.
To do this, use the EtherCAT controller or the Festo
Maintenance Tool (CPX−FMT) or handheld unit (CPX−MMI).
CPX−specific configuration and parameter data can be
entered only with CPX−FMT or CPX−MMI.
·
Check the parameterisation, using spot checks if
necessary.
Summary of Contents for CPX-FB38
Page 2: ......
Page 8: ...Contents and general instructions VI Festo P BE CPX FB38 EN en 0804NH...
Page 17: ...Installation 1 1 Festo P BE CPX FB38 EN en 0804NH Chapter 1...
Page 37: ...Commissioning 2 1 Festo P BE CPX FB38 EN en 0804NH Chapter 2...
Page 91: ...Diagnosis 3 1 Festo P BE CPX FB38 EN en 0804NH Chapter 3...
Page 111: ...Technical appendix A 1 Festo P BE CPX FB38 EN en 0804NH Appendix A...
Page 115: ...Index B 1 Festo P BE CPX FB38 EN en 0804NH Appendix B...
Page 116: ...B Index B 2 Festo P BE CPX FB38 EN en 0804NH Contents B Index B 1...