
4
Commissioning
Festo – P.BE-CPX-FB37-EN – 1406NH – English
53
Fig. 4.23 FFT message
7. Confirm the message by pressing “OK”.
8. Switch on the power supply for the bus node.
The bus node switches to the status “Bootloader mode”.
9. Follow the instructions of the software.
Further information can be found in the online help of the Festo Field Device Tool (FFT).
4.10
Checklist for commissioning a CPX terminal
•
Please observe the general commissioning instructions in the CPX system description.
•
Check the DIL switch settings and the network configuration before using and replacing CPX termin-
als.
•
Check the configured address range. If necessary, test the I/Os.
•
Check the address assignment of the I/Os on the CPX terminal. For this purpose you can, if neces-
sary, force the I/Os (
CPX system description).
•
Make sure that the desired parameterisation of the CPX terminal in the commissioning phase or
after network interruptions is restored by the higher-order controller. This ensures that if the CPX
terminal is replaced, the new terminal will also be operated with the desired parameter settings.
•
Use spot checks if necessary to check the parameterisation, either with a configuration program
(e.g. TwinCAT), the Festo Maintenance Tool (FMT) or an operator unit (CPX-MMI).