20
The diagram opposite shows how
to connect the Hydroswitch to the
3-pin connector on the Sentinel 2
Control box.
If required, the Hydroswitch can be tested prior to plumbing it into the system:
Connect the communications cable to the
Sentinel2, read the settings, and then select the
PRV installation tab.
The valve position can be changed by using the
controls within the Manual Override panel,
located in the PRV Installation tab.
Alternate between setting the target pressure
output between Low and High, then clicking the
Override button.
The Override will be active for the selected time,
then the target setting will return to the regular
operation settings.
Note: The Hydroswitch waits for 10 seconds
before any change occurs.
Check the valve is switching to confirm it is
operating correctly. (It will only switch when the
override target pressure does not match the
current target of regular operation).