3
Position Control box and Hydroswitch / Connect. ................................................ 35
Connect External Pressure transducers to Sentinel 2 .......................................... 36
Prepare the PRV for Sentinel water feed / pressure transducers........................ 46
Connect transducers and control pipework on PRV side ..................................... 49
Fitting and adjusting the HWM mechanical actuator............................................ 51
Testing the Actuator and PRV Pressure change response ................................... 55
Setup of pressure control using a Time profile.............................................. 56
Setup of a (pressure) Safety Override for Time Control ................................ 58
Setup of pressure control using a Flow profile .............................................. 58
Setup of pressure control using a combined Time and Flow profile ........... 61
Setting Logger Startup / Measurement Sample Rates .......................................... 63
Setting Network access parameters ............................................................... 65