![Fayat BOMAG BW 100 ADM-5 Operating Instruction Download Page 39](http://html1.mh-extra.com/html/fayat/bomag-bw-100-adm-5/bomag-bw-100-adm-5_operating-instruction_3686662039.webp)
3.5 Loading/transporting the machine
Use only stable loading ramps of sufficient load
bearing capacity.
Loading ramps and transport vehicle must be
free of grease, oil, snow and ice.
The ramp inclination must be less than the gra-
deability of the machine.
Make sure that persons are not endangered by
the machine tipping or sliding off. The
instructing person must stand within view of the
operator, but outside the danger zone.
Secure the machine with the articulation lock
after driving it onto the transport vehicle or
before loading it with a crane.
Do not use lashing points that are damaged or
impaired in any way.
Always use appropriate lashing tackle at the
lashing points.
Use lashing tackle only in the specified loading
direction.
Lashing tackle must not be damaged by
machine parts.
Secure the machine on the transport vehicle
against rolling, slipping and turning over.
Loads may only be attached and hoisted by an
expert/qualified person.
Only use lifting and lashing tackle with suffi-
cient load bearing capacity for the weight to be
loaded.
Fasten the lifting tackle only at the specified
lifting points.
Danger to the life of persons if they step or
stand under a suspended load.
When lifting the machine, make sure the load
does not move in an uncontrolled way. If nec-
essary, hold the load steady with guide ropes.
Concerning your safety – Loading/transporting the machine
BW 100 ADM-5
39
Summary of Contents for BOMAG BW 100 ADM-5
Page 9: ...1 Introduction Introduction BW 100 ADM 5 9...
Page 13: ...2 Technical data Technical data BW 100 ADM 5 13...
Page 18: ...Technical data Noise and vibration data BW 100 ADM 5 18...
Page 19: ...3 Concerning your safety Concerning your safety BW 100 ADM 5 19...
Page 65: ...4 Indicators and control elements Indicators and control elements BW 100 ADM 5 65...
Page 82: ...Indicators and control elements Outside of machine BW 100 ADM 5 82...
Page 83: ...5 Checks prior to start up Checks prior to start up BW 100 ADM 5 83...
Page 97: ...6 Operation Operation BW 100 ADM 5 97...
Page 128: ...Operation Emergency procedures BW 100 ADM 5 128...
Page 129: ...7 Loading transporting the machine Loading transporting the machine BW 100 ADM 5 129...
Page 139: ...8 Maintenance Maintenance BW 100 ADM 5 139...
Page 194: ...Maintenance As required BW 100 ADM 5 194...
Page 195: ...9 Setting up refitting Setting up refitting BW 100 ADM 5 195...
Page 200: ...Setting up refitting Edge cutter mounting and removing tools BW 100 ADM 5 200...
Page 201: ...10 Troubleshooting Troubleshooting BW 100 ADM 5 201...
Page 206: ...Fuse Amperage Designation F00 80 A Main fuse Troubleshooting Fuse assignment BW 100 ADM 5 206...
Page 212: ...Troubleshooting Trouble shooting ECONOMIZER BW 100 ADM 5 212...
Page 213: ...11 Disposal Disposal BW 100 ADM 5 213...
Page 215: ......
Page 216: ......