![Fayat BOMAG BW 100 ADM-5 Operating Instruction Download Page 20](http://html1.mh-extra.com/html/fayat/bomag-bw-100-adm-5/bomag-bw-100-adm-5_operating-instruction_3686662020.webp)
3.1 Basic prerequisites
3.1.1 General
This machine has been built in compliance with
the latest technical standard and complies with
the applicable regulations and technical rules.
However, dangers for persons and property
may arise from this machine, if:
n
it is used for purposes other than the ones it
is intended for,
n
it is operated by untrained personnel,
n
it is changed or converted in an unprofes-
sional way,
n
the safety instructions are not observed.
Each person involved in the operation, mainte-
nance and repair of the machine must there-
fore read and comply with these safety regula-
tions. If necessary, the operating company
must obtain the relevant signatures as confir-
mation.
Furthermore, the following obviously also
applies:
n
applicable accident prevention instructions,
n
generally accepted safety and road traffic
regulations,
n
country/state specific safety regulations.
It is the duty of the operator to be acquainted
with the safety regulations and to apply these
accordingly. This also applies for local regula-
tions and regulations concerning different types
of handling activities. Should the recommenda-
tions in these instructions be different from the
regulations valid in your country, you must
comply with the safety regulations valid in your
country.
Concerning your safety – Basic prerequisites
BW 100 ADM-5
20
Summary of Contents for BOMAG BW 100 ADM-5
Page 9: ...1 Introduction Introduction BW 100 ADM 5 9...
Page 13: ...2 Technical data Technical data BW 100 ADM 5 13...
Page 18: ...Technical data Noise and vibration data BW 100 ADM 5 18...
Page 19: ...3 Concerning your safety Concerning your safety BW 100 ADM 5 19...
Page 65: ...4 Indicators and control elements Indicators and control elements BW 100 ADM 5 65...
Page 82: ...Indicators and control elements Outside of machine BW 100 ADM 5 82...
Page 83: ...5 Checks prior to start up Checks prior to start up BW 100 ADM 5 83...
Page 97: ...6 Operation Operation BW 100 ADM 5 97...
Page 128: ...Operation Emergency procedures BW 100 ADM 5 128...
Page 129: ...7 Loading transporting the machine Loading transporting the machine BW 100 ADM 5 129...
Page 139: ...8 Maintenance Maintenance BW 100 ADM 5 139...
Page 194: ...Maintenance As required BW 100 ADM 5 194...
Page 195: ...9 Setting up refitting Setting up refitting BW 100 ADM 5 195...
Page 200: ...Setting up refitting Edge cutter mounting and removing tools BW 100 ADM 5 200...
Page 201: ...10 Troubleshooting Troubleshooting BW 100 ADM 5 201...
Page 206: ...Fuse Amperage Designation F00 80 A Main fuse Troubleshooting Fuse assignment BW 100 ADM 5 206...
Page 212: ...Troubleshooting Trouble shooting ECONOMIZER BW 100 ADM 5 212...
Page 213: ...11 Disposal Disposal BW 100 ADM 5 213...
Page 215: ......
Page 216: ......