7.2 Loading the machine
Use only stable loading ramps of sufficient load
bearing capacity.
Loading ramps and transport vehicle must be
free of grease, oil, snow and ice.
The ramp inclination must be less than the gra-
deability of the machine.
Make sure that any persons keep a safety dis-
tance of at least 2 metres while the machine is
driven onto or down from the transport vehicle.
The instructing person should not be inside the
travel range of the machine.
1.
Fasten your seat belt.
2.
Set the throttle lever to position “MAX I”.
DANGER!
Danger to life caused by the
machine slipping or turning over!
– Make sure that no persons are in
the danger zone.
3.
Drive the machine carefully onto the trans-
port vehicle.
4.
Observe the centre of gravity.
5.
Switch off the engine and remove the igni-
tion key.
6.
Attach and secure the articulation lock
Chapter 8.2.3.1 ‘Engaging the articula-
.
The foldable ROPS can be folded
down to reduce the transport height.
7.
If necessary, fold down the foldable ROPS.
MIN.
MAX II
MAX I
B-880-0160
Fig. 123
Loading / transporting the machine – Loading the machine
BW 100 ADM-5
131
Summary of Contents for BOMAG BW 100 ADM-5
Page 9: ...1 Introduction Introduction BW 100 ADM 5 9...
Page 13: ...2 Technical data Technical data BW 100 ADM 5 13...
Page 18: ...Technical data Noise and vibration data BW 100 ADM 5 18...
Page 19: ...3 Concerning your safety Concerning your safety BW 100 ADM 5 19...
Page 65: ...4 Indicators and control elements Indicators and control elements BW 100 ADM 5 65...
Page 82: ...Indicators and control elements Outside of machine BW 100 ADM 5 82...
Page 83: ...5 Checks prior to start up Checks prior to start up BW 100 ADM 5 83...
Page 97: ...6 Operation Operation BW 100 ADM 5 97...
Page 128: ...Operation Emergency procedures BW 100 ADM 5 128...
Page 129: ...7 Loading transporting the machine Loading transporting the machine BW 100 ADM 5 129...
Page 139: ...8 Maintenance Maintenance BW 100 ADM 5 139...
Page 194: ...Maintenance As required BW 100 ADM 5 194...
Page 195: ...9 Setting up refitting Setting up refitting BW 100 ADM 5 195...
Page 200: ...Setting up refitting Edge cutter mounting and removing tools BW 100 ADM 5 200...
Page 201: ...10 Troubleshooting Troubleshooting BW 100 ADM 5 201...
Page 206: ...Fuse Amperage Designation F00 80 A Main fuse Troubleshooting Fuse assignment BW 100 ADM 5 206...
Page 212: ...Troubleshooting Trouble shooting ECONOMIZER BW 100 ADM 5 212...
Page 213: ...11 Disposal Disposal BW 100 ADM 5 213...
Page 215: ......
Page 216: ......