![Fayat BOMAG BW 100 ADM-5 Operating Instruction Download Page 168](http://html1.mh-extra.com/html/fayat/bomag-bw-100-adm-5/bomag-bw-100-adm-5_operating-instruction_3686662168.webp)
3.
Loosen the tensioning screw (1) and the
screw (2) on the generator.
4.
Relieve and remove the V-belt.
5.
Assemble a new V-belt at the generator.
6.
Tension the V-belt to the specified value
Chapter 8.8.2 ‘Checking, tensioning the
7.
Retighten clamping screw (1) and screw
(2).
8.9.4 Checking the anti-freeze concentration and the condition
of the coolant
Protective equip-
ment:
n
Protective gloves
n
Safety goggles
1.
Park the machine in secured condition
Chapter 6.9 ‘Parking the machine in
secured condition’ on page 117
2.
Allow the engine to cool down.
3.
Remove the cover (1) from the compensa-
tion tank and check the anti-freeze concen-
tration with a conventional tester.
4.
Check the condition of the coolant.
5.
Thoroughly flush the cooling system if the
coolant is contaminated by corrosion resi-
dues or other suspended matter
8.11.3 ‘Changing the coolant’ on page 179
6.
Close the cover again.
8.9.5 Checking the hydraulic lines
This work must only be performed by an
expert / qualified person!
Fig. 156
Fig. 157
Maintenance – Every 500 operating hours
BW 100 ADM-5
168
Summary of Contents for BOMAG BW 100 ADM-5
Page 9: ...1 Introduction Introduction BW 100 ADM 5 9...
Page 13: ...2 Technical data Technical data BW 100 ADM 5 13...
Page 18: ...Technical data Noise and vibration data BW 100 ADM 5 18...
Page 19: ...3 Concerning your safety Concerning your safety BW 100 ADM 5 19...
Page 65: ...4 Indicators and control elements Indicators and control elements BW 100 ADM 5 65...
Page 82: ...Indicators and control elements Outside of machine BW 100 ADM 5 82...
Page 83: ...5 Checks prior to start up Checks prior to start up BW 100 ADM 5 83...
Page 97: ...6 Operation Operation BW 100 ADM 5 97...
Page 128: ...Operation Emergency procedures BW 100 ADM 5 128...
Page 129: ...7 Loading transporting the machine Loading transporting the machine BW 100 ADM 5 129...
Page 139: ...8 Maintenance Maintenance BW 100 ADM 5 139...
Page 194: ...Maintenance As required BW 100 ADM 5 194...
Page 195: ...9 Setting up refitting Setting up refitting BW 100 ADM 5 195...
Page 200: ...Setting up refitting Edge cutter mounting and removing tools BW 100 ADM 5 200...
Page 201: ...10 Troubleshooting Troubleshooting BW 100 ADM 5 201...
Page 206: ...Fuse Amperage Designation F00 80 A Main fuse Troubleshooting Fuse assignment BW 100 ADM 5 206...
Page 212: ...Troubleshooting Trouble shooting ECONOMIZER BW 100 ADM 5 212...
Page 213: ...11 Disposal Disposal BW 100 ADM 5 213...
Page 215: ......
Page 216: ......