Manual
EXCELENT Premium 6; 8
49
│
52
Report on the Delivery of the Machine and Putting
into Operation
Type of machine:
Serial number of the machine:
Date of delivery and putting into operation:
The following workers were familiarised with the machine, complete instructions for use and
maintenance and terms of guarantee:
Name and surname
Function
Signature
1. .........................................................................................................................................
2. .........................................................................................................................................
3. .........................................................................................................................................
4. .........................................................................................................................................
The following documents were delivered with the machine:
Log book
Instructions for use
Spare parts catalogue
Other documents..........................................................................................................................
The guarantee will not be accepted if the machine is operated by other persons than
those stated in this report or if there have been any interventions in the machine that are
not determined by the instructions for use!!!
The machine was delivered with all parts according to the purchase contract, functional
and undamaged.
Delivered by (name and surname, function)
Accepted by (name and surname,
function)
-----------------------------------
-------------------------------------------
Stamp, date and signature
Stamp, date and signature
Send the completed document together with a copy of the letter of guarantee within 5
days since the machine has been put into operation as a registered letter to the address
of the producer. The document is groundwork for accepting guarantee.
YES
NO
YES
NO
YES
NO