![background image](http://html1.mh-extra.com/html/fadini/drive-700/drive-700_instruction-manual_3188007006.webp)
Lay one or more connection tubes into the digging to the motor-pump Drive 700 Estru: it is advisable that the motor pump be
installed as near as possible to the jack (fixing by expanding bolts) to facilitate the hydraulic connections.
Weld the 4 corner plates, supplied with the equipment, onto the anchoring plate to take the jack galvanized base, making sure that
the jack be in the correct position for its center line to coincide with the upper hinge center line.
Pic. 5
Pic. 6
English
6
Pipe for water
drainage
Corner plates welded
to the anchoring
plate
15-20 cm
ø 50
12-15 cm
!
Underground oil-hydraulic operator with separate motor-pump
DRIVE 700
istr_drive700_GB.ai 6 10/05/2022 15:15:50