GATE PREPARATORY WORKS
It is required that the gate bottom hinge be removed, being replaced by the rotation shaft/pivot of Drive 700.
DIGGING AND FIXING THE ANCHOR BASE PLATE
Dig a hole in the ground of the size as indicated below in Pic. 4 at the foot of the gate post to take the anchor base plate and fix it
by concrete.
Pic. 3
Pic. 4
English
5
Concrete
casting
Draining
pebbles
Soakaway
tube
13 cm
58 - 60 mm
6,5 cm
IMPORTANT: the position of the ground foundation box is in relation to the position of the upper
hinge. The center of the hole in the foundation box (therefore the jack shaft center) and the center
of the upper hinge are to be on the same line. Digging is to be carried out in consideration of this.
!
!
!
!
0.0
25 cm
55 cm
30 cm
!
Anchor
base plate
IMPORTANT:
the gate must be allowed to swing open and close perfectly leveled.
!
!
Underground oil-hydraulic operator with separate motor-pump
DRIVE 700