MANUAL - WELDER Fantasy PULSE BI-201
BEFORE WORK:
•
Check voltage value, phase and frequency of the supply current before switching the machine to the mains.
•
Parameters supply voltage are given in the section of the technical data and on the nameplate.
•
Check the grounding wire connection device from the mains.
•
Make sure that the power network may provide coverage of the requirements of input power for the device
under its normal operation. Fuse size and parameters of the power cord are given in the technical data and
on the nameplate. Connecting and sharing of the power cord and the plug should be made by a qualified
electrician.
•
Remove all flammable material from the welding area.
•
Welding use suitable protective clothing: gloves, lab coat, shoes, helmet or mask having a corresponding
certificate.
CONNECTION METHODS FOR MIG / MAG
To extend the life and ensure reliable operation, observe the following rules:
•
The device should be placed in a well-ventilated room, where there is a free circulation of air.
•
Do not place the device on a wet surface.
•
Use filler wire diameter and weight of the reel according to the manufacturer's instructions (D200, max. 5
kg). For up to the minute technical equipment and welding cables.
Installation of welding wire spool:
Welder Fantasy series devices PULSE BI-200 are equipped with a professional wire feeders. This model has a 2 roll
feeder capable of operating with a handle max. 4MB for welding steel wire and 3m in the case of the welding wire of
aluminum alloy. Holder for welding wire spools can be mounted with a diameter of 200 mm - 100 mm and 5 kg - 1 kg.