14
13
B614
20
532297 - Rev.D
1
1
2
4
1
2
3
ROUNTING THE CABLES INSIDE THE BARRIER
51.18 in (130 cm) of cable are necessary.
1. (
13
) Arrange the cables inside the barrier. Se-
cure the cables with the cable ties provided in
postions
1
,
2
and
3
.
2. (
14
) Remove the bolt with washer
1
. Open
cable strain relief
2
. Bring the cables to the board.
3. Use the screw and washer
1
to close the cable
strain relief.
The electrical connections must be made after com-
pleting the mechanical installation
Summary of Contents for B614
Page 1: ...B614...