Chapter 3
Connecting the Switch to the Network
3 - 14
Resource
State
Forwarding
‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐‐
Switch
Up
Disabled
Check the version at the replacement ARX. In this example, the software
version (6.02.00) is not outdated:
SWITCH>
show
version
Copyright
(c)
2002
‐
2009
by
F5
Networks,
Inc.
All
rights
reserved.
Running
Release
test1.rel
:
Version
6.02.000
.11927
(Nov
23
2009
21:57:26)
[nbuilds]
Armed
Release
test1.rel
:
Version
6.02.000.11927
(Nov
23
2009
21:57:26)
[nbuilds]
Backup
Release
test3.rel
:
Version
6.02.000.11927
(Nov
23
2009
21:57:26)
[nbuilds]
System
Configuration:
Version
501000.36
Connecting to the Client/Server Network
The replacement switch must be connected to a machine on the network
with:
• a new software-release file and
• the running-config file from the failed ARX.
If the replacement switch is running a release earlier than 6.0.0, the
interview script only connects the switch to your out-of-band management
network. If you are running 6.00.000 or later, or if your ARX release files
and running-config files are accessible through the out-of-band network,
you can skip this section. These steps are required for systems that need to
access the client/server network.
To access the client/server network, enable at least one client/server VLAN
with at least one member interface and a management IP and establish a
default route on that VLAN’s IP network. This example reaches a
client/server network on VLAN 74:
SWITCH>
enable
SWITCH#
config
SWITCH(cfg)#
vlan
74
SWITCH(cfg
‐
vlan[74])#
members
1/5
SWITCH(cfg
‐
vlan[74])#
exit
SWITCH(cfg)#
interface
vlan
74
SWITCH(cfg
‐
if
‐
vlan[74])#
ip
address
192.168.74.66
255.255.255.0
SWITCH(cfg
‐
if
‐
vlan[74])#
no
shutdown
SWITCH(cfg
‐
if
‐
vlan[74])#
exit
SWITCH(cfg)#
interface
gigabit
1/5
SWITCH(cfg
‐
if
‐
gig[1/5])#
no
shutdown
SWITCH(cfg
‐
if
‐
gig[1/5])#
exit
SWITCH(cfg)#
ip
route
0.0.0.0
0.0.0.0
192.168.74.1
SWITCH(cfg)#
exit
SWITCH#
Summary of Contents for ARX-2500
Page 1: ...ARX 2500 Hardware Installation Guide MAN 0417 00 ...
Page 2: ......
Page 6: ...vi ...
Page 7: ...Table of Contents ...
Page 8: ......
Page 10: ...Table of Contents x ...
Page 11: ......
Page 12: ...Table of Contents xii ...
Page 14: ......
Page 22: ...Chapter 1 Introduction 1 10 ...
Page 24: ......
Page 36: ...Chapter 2 Unpacking and Installing the Switch 2 14 ...
Page 38: ......
Page 55: ...4 Maintenance POST Diagnostics ...
Page 56: ......
Page 60: ......
Page 64: ...Appendix A Replacing Optical Transceivers or Chassis A 6 ...
Page 65: ...Index ...
Page 66: ......
Page 68: ...Index Index 4 ...