![F5 ARX-2000 Hardware Installation Manual Download Page 46](http://html.mh-extra.com/html/f5/arx-2000/arx-2000_hardware-installation-manual_535188046.webp)
Chapter 3
Connecting the Switch to the Network
3 - 18
SWITCH>
enable
SWITCH#
copy
ftp://juser:[email protected]/a2kconfig
scripts
running
SWITCH#
show
scripts
scripts
running
Feb
12
17:45
2.1k
SWITCH#
run
scripts
running
The
running
‐
config
script
set
up
all
local
parameters,
such
as
the
hostname
and
the
network
settings:
SWITCH#;
ARX
‐
2000
SWITCH#;
Version
6.02.000.14293
(Dec
2
2011
20:04:01)
[nbuilds]
SWITCH#;
Database
version:
602000.21
SWITCH#;
Generated
running
‐
config
Thu
Dec
8
03:10:49
2011
SWITCH#;
System
UUID
876616f6
‐
79ac
‐
11d8
‐
946f
‐
958fcb4e6e35
SWITCH#;
ip
private
vlan
internal
1008
metalog
1009
subnet
169.254.100.0
255.255.255.0
SWITCH#;
SWITCH#terminal
character
‐
set
unicode
‐
utf
‐
8
SWITCH#;=================================
vlan
==================================
SWITCH#config
SWITCH#
vlan
74
SWITCH#
description
"personnel
dept."
SWITCH#
members
1/5
to
1/6
SWITCH#...
SWITCH#;================================
system
=================================
SWITCH#config
SWITCH(cfg)#
clock
timezone
America
New_York
SWITCH(cfg)#
hostname
prtlndA
prtlndA(cfg)#
ip
domain
‐
list
wwmed.com
prtlndA(cfg)#
...
prtlndA(cfg)#
exit
prtlndA#
If you copied the private subnet and mask from the defunct switch (recall
Matching the Private Subnet, on page 3-7
), this completes the switch
replacement. Otherwise, the new switch learns its private subnet from its
peer, re-configures itself, and reboots. (A reboot is necessary to change the
private subnet of an ARX.)
See the
ARX® CLI Network-Management Guide
for detailed configuration
instructions.
Connecting the OOB Management Interface
After you boot the switch, you can connect the Ethernet out-of-band (OOB)
management interface to a management station or network. To locate the
management interface, see
Figure 3.1
. You can use this interface to access
the GUI (ARX Manager) or the CLI.
Summary of Contents for ARX-2000
Page 1: ...ARX 2000 Hardware Installation Guide 810 0062 00 ...
Page 2: ......
Page 6: ...vi ...
Page 7: ...Table of Contents ...
Page 8: ......
Page 11: ......
Page 12: ...Table of Contents xii ...
Page 14: ......
Page 22: ......
Page 28: ...Chapter 2 Unpacking and Installing the Switch 2 8 ...
Page 30: ......
Page 48: ...Chapter 3 Connecting the Switch to the Network 3 20 ...
Page 49: ...4 Maintenance Powering Down the ARX 2000 LED Indicators POST Diagnostics ...
Page 50: ......
Page 60: ......
Page 72: ...Appendix A Removing and Replacing FRUs A 14 ...
Page 73: ...B Installing the Rail Kit Installing the Rail Kit ...
Page 74: ......
Page 76: ...Appendix B Installing the Rail Kit B 4 ...
Page 77: ...Index ...
Page 78: ......
Page 80: ...Index Index 4 ...