![F5 ARX-2000 Hardware Installation Manual Download Page 42](http://html.mh-extra.com/html/f5/arx-2000/arx-2000_hardware-installation-manual_535188042.webp)
Chapter 3
Connecting the Switch to the Network
3 - 14
Running
Release
test2.rel
:
Version
6.02.000.14365
(May
2
2012
20:08:52)
[nbuilds]
Armed
Release
test2.rel
:
Version
6.02.000.14365
(May
2
2012
20:08:52)
[nbuilds]
Backup
Release
test1.rel
:
Version
6.02.000.14364
(May
2
2012
16:53:14)
[bmccann]
System
Configuration:
Version
602000.33
prtlndA
uptime
is
2
weeks,
0
days,
2
hours,
25
minutes.
Slot
Admin
ModuleType
ModuleState
FW
Upgrade
‐‐‐‐ ‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐‐
1
Enabled
ACM
Online
Disabled
Resource
State
Forwarding
‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐‐
Switch
Up
Disabled
Check the version at the replacement ARX. In this example, the software
version (5.1.0) is outdated.
SWITCH>
show
version
Copyright
(c)
2002
‐
2009
by
F5
Networks,
Inc.
All
rights
reserved.
Running
Release
test1.rel
:
Version
5.01.000
.11927
(Nov
23
2009
21:57:26)
[nbuilds]
Armed
Release
test1.rel
:
Version
5.01.000.11927
(Nov
23
2009
21:57:26)
[nbuilds]
Backup
Release
test3.rel
:
Version
5.01.000.11927
(Nov
23
2009
21:57:26)
[nbuilds]
System
Configuration:
Version
501000.36
SWITCH
uptime
is
0
weeks,
0
days,
0
hours,
8
minutes.
...
Accessing the Client/Server Network
The replacement switch must be connected to a machine on the network
containing:
• a new software-release file and
• the running-config file from the failed ARX.
If the replacement switch is running a release earlier than 6.0.0, the
interview script connects the switch to your OOB management network
only. If you are running 6.0.0 or later or if your ARX release files and
running-config files are accessible through the OOB network, you can skip
this section. These steps are required for systems that need to access the
client/server network.
Summary of Contents for ARX-2000
Page 1: ...ARX 2000 Hardware Installation Guide 810 0062 00 ...
Page 2: ......
Page 6: ...vi ...
Page 7: ...Table of Contents ...
Page 8: ......
Page 11: ......
Page 12: ...Table of Contents xii ...
Page 14: ......
Page 22: ......
Page 28: ...Chapter 2 Unpacking and Installing the Switch 2 8 ...
Page 30: ......
Page 48: ...Chapter 3 Connecting the Switch to the Network 3 20 ...
Page 49: ...4 Maintenance Powering Down the ARX 2000 LED Indicators POST Diagnostics ...
Page 50: ......
Page 60: ......
Page 72: ...Appendix A Removing and Replacing FRUs A 14 ...
Page 73: ...B Installing the Rail Kit Installing the Rail Kit ...
Page 74: ......
Page 76: ...Appendix B Installing the Rail Kit B 4 ...
Page 77: ...Index ...
Page 78: ......
Page 80: ...Index Index 4 ...