24
5. Apply the glue to the appropriate leak/s, as
well as on the patch itself. Let the glue dry for
approx. 2-4 minutes.
6. Press the patch down with a soft object. Make
sure to work on an even surface without any
creases or folds. Using a rounded object,
gently remove any bubbles, moving outwards
from the centre.
7. After the repair, let the glue dry or at least 12
hours.
8. After the drying process is complete, add
more glue to the borders of the patches.
9. Let the glue dry for approx. 4 hours.
Important: Before taking the board into
the water after the repair, test the re-
paired patch to test whether it’s sealed.
Under no circumstances should you at-
tempt to repair larger damaged areas
yourself. Take the board to a specialist
repair shop.
Maintenance
Test whether the pump is well-greased before or
during operation.
To grease it, open the top cap and transfer a thin
layer of oil of grease on the sealed areas and
conductors.
Note on disposal
Dispose of the item and its packaging materials
in accordance with current local regulations.
Packaging materials like e.g. foil bags must be
kept away from children.
Keep the packaging materials out of reach of
children, due to risk of su
ff
ocation.
Dispose of the equipment and
packaging in an environmentally-
friendly manner.
The recycling code is used to identify
various materials for recycling.
The code consists of the recycling
symbol – which is meant to reflect the
recycling cycle – and a number which identifies
the material.
Service handling
IAN: 310833
Service Great Britain
Tel.:
00800-88080808
E-Mail: [email protected]
Service Ireland
Tel.:
00800-88080808
E-Mail: [email protected]
GB/IE/NI