Installing Power Supply Units
BlackDiamond 12800 Series Switches Hardware Installation Guide
96
NOTE
A minimum of two Extreme Networks 325 W AC PSUs are required to run a BlackDiamond 12802 switch.
WARNING!
Do not put your hand into an open power supply bay when a power supply is not present. Empty power supply bays
require a cover plate at all times.
CAUTION
Do not slam the Extreme Networks 325 W AC PSU into the system backplane.
CAUTION
To prevent an electrical hazard, make sure before you install the PSU in the power supply bay that the AC power
cord is not connected to the PSU.
Figure 57: Installing a 325 W AC PSU
4
To secure the 325 W AC PSU in the power supply bay, align and tightening the two captive screws
on the PSU front panel. As you tighten the screws, work from left to right (see
Figure 58
).
Table 21: Recommended Installation Sequence (View from Rear of Chassis)
Left Power Supply Bays
Right Power Supply Bays
Installation # 1
Installation # 3
(If empty, cover plate is required.)
Installation # 2
Installation # 4
(If empty, cover plate is required.)
Torino AC PSU_01
Chassis
AC PSU
Summary of Contents for BlackDiamond 12800 Series
Page 8: ...Table of Contents BlackDiamond 12800 Series Switches Hardware Installation Guide 8...
Page 12: ...Preface BlackDiamond 12800 Series Switches Hardware Installation Guide 12...
Page 13: ...1 BlackDiamond 12800 Series Switches...
Page 14: ......
Page 39: ...2 Installing BlackDiamond Switches and Modules...
Page 40: ......
Page 113: ...3 BlackDiamond Maintenance Procedures...
Page 114: ......
Page 131: ...4 Appendixes...
Page 132: ......
Page 146: ...Safety Information BlackDiamond 12800 Series Switches Hardware Installation Guide 146...
Page 160: ...Index BlackDiamond 12800 Series Switches Hardware Installation Guide 160...