Unpacking the BlackDiamond 12802 Chassis
BlackDiamond 12800 Series Switches Hardware Installation Guide
65
Figure 33: Unpacking the BlackDiamond 12802 Chassis
5
To lift the BlackDiamond chassis, on each side have one person support the bottom of the chassis as
you lift the chassis off the bottom foam cushion.
CAUTION
Do not lift the chassis using the top of the front opening. The weight of the chassis may cause the enclosure to
deform.
Set the chassis on a secure, flat work surface.
6
Break the inspection seal on the packing bag and remove the chassis from the bag.
NOTE
Save the box and all packaging for future use in case the BlackDiamond 12802 chassis must be returned to
Extreme Networks, Inc.
BlackDiamond
documentation pack
with ESD-preventive
wrist strap
BlackDiamond
12802 switch
Rack-mount
brackets and
hardware
BD_149
Summary of Contents for BlackDiamond 12800 Series
Page 8: ...Table of Contents BlackDiamond 12800 Series Switches Hardware Installation Guide 8...
Page 12: ...Preface BlackDiamond 12800 Series Switches Hardware Installation Guide 12...
Page 13: ...1 BlackDiamond 12800 Series Switches...
Page 14: ......
Page 39: ...2 Installing BlackDiamond Switches and Modules...
Page 40: ......
Page 113: ...3 BlackDiamond Maintenance Procedures...
Page 114: ......
Page 131: ...4 Appendixes...
Page 132: ......
Page 146: ...Safety Information BlackDiamond 12800 Series Switches Hardware Installation Guide 146...
Page 160: ...Index BlackDiamond 12800 Series Switches Hardware Installation Guide 160...