Grounding the BlackDiamond 12800 Series Chassis
BlackDiamond 12800 Series Switches Hardware Installation Guide
69
To ground the chassis:
1
Locate the grounding point on the back of the chassis (
Figure 38
and figure)).
Figure 38: Back of BlackDiamond 12804 Chassis
Figure 39: Back of BlackDiamond 12802 Chassis
2
Strip 0.5-inch (1.2-cm) of insulation from the stranded copper wire cable.
3
Insert the stripped wire into the cable lug.
CAUTION
Be sure that no copper is visible between the lug and the cable insulation.
4
Crimp the lug onto the cable according to the manufacturer’s specifications.
5
Insert the screws through the lug and into the grounding point on the back of the chassis.
6
Connect the other end of the wire to a known reliable earth ground point at your site.
EX_128A
Grounding point
PSU
/
fan
controllers
Fan tray
Grounding
point
PSU/fan controller
module
Power
supplies
BD_142A
Summary of Contents for BlackDiamond 12800 Series
Page 8: ...Table of Contents BlackDiamond 12800 Series Switches Hardware Installation Guide 8...
Page 12: ...Preface BlackDiamond 12800 Series Switches Hardware Installation Guide 12...
Page 13: ...1 BlackDiamond 12800 Series Switches...
Page 14: ......
Page 39: ...2 Installing BlackDiamond Switches and Modules...
Page 40: ......
Page 113: ...3 BlackDiamond Maintenance Procedures...
Page 114: ......
Page 131: ...4 Appendixes...
Page 132: ......
Page 146: ...Safety Information BlackDiamond 12800 Series Switches Hardware Installation Guide 146...
Page 160: ...Index BlackDiamond 12800 Series Switches Hardware Installation Guide 160...