
348
TRIM AND TILT
ROUTINE INSPECTIONS
ROUTINE INSPECTIONS
General
Check for exte rnal signs of fluid leakage. Correct
causes as necessary.
Check the battery to be sure it is in good operating
condition.
Reservoir Fluid
Check reservoir f luid leve l at least e very th ree
years or 300 operating hours. System capacity is
approximately:
•
40 - 60 HP:
15.2 fl. oz. (450 ml)
•
75 - 90 HP:
21 fl. oz. (620 ml)
IMPORTANT:
Use only
Evinrude/Johnson
Bi o-
degradable TNT
Fluid to fill the hydraulic system.
Refer to
dure.
Manual Release Valve
Check the manual release valve with a torq ue
wrench.
IMPORTANT:
Tighten valve to a torque of 45 to
55 in. lbs. (5 to 6 N·m).
Stern Brackets
Inspect the stern brackets for binding.
Tighten starboard tilt tube nut to a torque of 45 to
50 ft. lbs. (61 to 68 N·m).
TROUBLESHOOTING
Use the following guidelines to check a single pis-
ton trim/tilt unit that is not working correctly.
Cylinder Leakdown:
•
Manual release valve seals
•
External leaks
No reverse lock:
•
External leaks
No operation, motor runs:
•
Manual release valve open
•
Fluid level low
•
Pump coupler
•
Hydraulic pump
No tilt down:
•
Manual release valve
•
Fluid level
Slow performance:
•
Manual release valve
•
Fluid level low
•
Mechanical binding
•
Electric motor
•
Hydraulic pump
Unit locked in tilt up:
•
Mechanical binding
•
Hydraulic pump
Summary of Contents for E-Tec 40 HP
Page 1: ......
Page 2: ......
Page 226: ...224 POWERHEAD POWERHEAD VIEWS 2 Cylinder Front 008160...
Page 227: ...225 POWERHEAD POWERHEAD VIEWS 10 2 Cylinder Rear 008161...
Page 228: ...226 POWERHEAD POWERHEAD VIEWS 2 Cylinder Top 008162...
Page 229: ...POWERHEAD POWERHEAD VIEWS 227 10 2 Cylinder Top Rope Start Models 008186...
Page 232: ...230 POWERHEAD POWERHEAD VIEWS 3 Cylinder Front 008166...
Page 233: ...231 POWERHEAD POWERHEAD VIEWS 10 3 Cylinder Rear 008167...
Page 234: ...232 POWERHEAD POWERHEAD VIEWS 3 Cylinder Top 008165...
Page 374: ...S 2...
Page 416: ......
Page 420: ......
Page 422: ......
Page 425: ......
Page 426: ......