339
GEARCASE SERVICE, 75 – 90 HP MODELS
GEARCASE ASSEMBLY
12
Shift Rod Housing Installation
Lubricate a new shift rod cover O-ring with
Triple-
Guard
grease. Install the O-ring into t he shift rod
cover.
IMPORTANT:
Make sure O-ring is fully seated
in groove.
Place the shift rod grommet on the shift rod.
Install shift rod sp acer u nder g rommet on 25 in.
models.
Apply
Triple-Guard
grease to the threa ded end of
the shift rod a nd insert it through the cover. Turn
the shift rod while p ushing it through the cover to
avoid damaging the O-ring.
Apply
Gasket Sealing Compound
to both sides of
a new shift rod cover gasket. Place the gasket on
the gearcase.
Thread the shift rod into t he shifter detent about
four turns.
Move shift rod from side to sid e while pushing on
the propeller shaft to ensure proper alignment of
the bearing housing locator pin into the pin hole in
the gearcase.
Apply
Gasket Sealing Compound
to the threads of
the shift rod cover screws. Tighten the screws to a
torque of 60 to 84 in. lbs. (7 to 9.5 N·m).
1.
O-ring
2.
Groove
006780
1.
Grommet
2.
Shift rod spacer
COA3568
2
1
2
1
1.
Cover gasket
2.
Grommet
COA3141
COA3569
2
1
Summary of Contents for E-Tec 40 HP
Page 1: ......
Page 2: ......
Page 226: ...224 POWERHEAD POWERHEAD VIEWS 2 Cylinder Front 008160...
Page 227: ...225 POWERHEAD POWERHEAD VIEWS 10 2 Cylinder Rear 008161...
Page 228: ...226 POWERHEAD POWERHEAD VIEWS 2 Cylinder Top 008162...
Page 229: ...POWERHEAD POWERHEAD VIEWS 227 10 2 Cylinder Top Rope Start Models 008186...
Page 232: ...230 POWERHEAD POWERHEAD VIEWS 3 Cylinder Front 008166...
Page 233: ...231 POWERHEAD POWERHEAD VIEWS 10 3 Cylinder Rear 008167...
Page 234: ...232 POWERHEAD POWERHEAD VIEWS 3 Cylinder Top 008165...
Page 374: ...S 2...
Page 416: ......
Page 420: ......
Page 422: ......
Page 425: ......
Page 426: ......