
282
MIDSECTION
TILLER HANDLE SERVICE – LONG HANDLE
Install shift cable on shift pin with a new cotter pin.
Install shift cable retainer on shift cable trunnion.
Use a soft-faced mallet to install the inner handle.
Secure tab of the inner handle into the outer han-
dle. Tab must be flush with the back of the flange
and top of tab must be flush with top of flange.
Apply
Nut Lock
on the screw threads, install the
washer and screw.
IMPORTANT:
Turn se lf-tapping screw counter-
clock-wise until th reads of screw en gage threads
of screw boss. Failure to follow this procedure will
damage th e screw bo ss th reads. Once threads
are engaged, tighten screw so that there is no
space between tab, washer and screw. Top of tab
MUST be flush with top of flange.
1.
Cotter pin
006720
1.
Shift cable retainer
006721
006680
1
1
1.
Back of flange
006682
006681
1
Summary of Contents for E-Tec 40 HP
Page 1: ......
Page 2: ......
Page 226: ...224 POWERHEAD POWERHEAD VIEWS 2 Cylinder Front 008160...
Page 227: ...225 POWERHEAD POWERHEAD VIEWS 10 2 Cylinder Rear 008161...
Page 228: ...226 POWERHEAD POWERHEAD VIEWS 2 Cylinder Top 008162...
Page 229: ...POWERHEAD POWERHEAD VIEWS 227 10 2 Cylinder Top Rope Start Models 008186...
Page 232: ...230 POWERHEAD POWERHEAD VIEWS 3 Cylinder Front 008166...
Page 233: ...231 POWERHEAD POWERHEAD VIEWS 10 3 Cylinder Rear 008167...
Page 234: ...232 POWERHEAD POWERHEAD VIEWS 3 Cylinder Top 008165...
Page 374: ...S 2...
Page 416: ......
Page 420: ......
Page 422: ......
Page 425: ......
Page 426: ......