342
GEARCASE SERVICE, 75 – 90 HP MODELS
GEARCASE ASSEMBLY
“O” Type Gearcases
Loosen retainer screws 1/4 turn.
Install wed ge, screw , and wa sher. Ap ply
Ultra
Lock
to threads and tig hten screw to a torq ue of
15 to 20 in. lbs. (1.7 to 2.3 N·m).
Re-tighten two re tainer screws to 18 to 20 f t. lbs.
(24 to 27 N·m).
Confirm that torque on the wedge screw is 15 to
20 in. lbs. (1.7 to 2.3 N·m).
Final Assembly and Adjustment
To complete gearcase assembly, refer to:
•
•
•
•
GEARCASE REMOVAL AND INSTALLATION
•
•
Propeller Hardware Installation
•
During bre ak-in pe riod of a reassembled
gearcase, change the gearcase lubricant between
10 to 20 hours of operation.
DSM02291
DSC02361
Summary of Contents for E-Tec 40 HP
Page 1: ......
Page 2: ......
Page 226: ...224 POWERHEAD POWERHEAD VIEWS 2 Cylinder Front 008160...
Page 227: ...225 POWERHEAD POWERHEAD VIEWS 10 2 Cylinder Rear 008161...
Page 228: ...226 POWERHEAD POWERHEAD VIEWS 2 Cylinder Top 008162...
Page 229: ...POWERHEAD POWERHEAD VIEWS 227 10 2 Cylinder Top Rope Start Models 008186...
Page 232: ...230 POWERHEAD POWERHEAD VIEWS 3 Cylinder Front 008166...
Page 233: ...231 POWERHEAD POWERHEAD VIEWS 10 3 Cylinder Rear 008167...
Page 234: ...232 POWERHEAD POWERHEAD VIEWS 3 Cylinder Top 008165...
Page 374: ...S 2...
Page 416: ......
Page 420: ......
Page 422: ......
Page 425: ......
Page 426: ......