
EVCO S.p.A.
Vcolor 679/689
| Installer manual ver. 1.0 | Code 144VC679E104
page
25
of
70
-
PROOFING phase (phase 4 retarding-proofing; phase 2 proofing)
Retarding-proofing:
Proofing:
Temperature regulation is active and has a neutral zone adjustment, the working setpoint is set by the end user. Moving from the re-
awakening setpoint (previous phase) to the proofing setpoint can be gradual, with the incremental percentages set while the
parameters are being set (parameters rL0 - rL10).
Relative humidity regulation is active and has a neutral zone adjustment, the working setpoint is set by the end user.
Duration in hours and minutes and evaporator fan speed are set by the end user.
Pressing the STOP key halts the cycle in progress.