
83
Align the position mark on the shift spindle
sprocket with that of shift drum, and then install
shift spindle.
Install dowel pins and new gasket.
Install gear box cover and bolts, and tighten.
Torque value: 1.0~1.4kgf-m
Install the shift spindle bracket, drive chain
protector, speedometer gear box and gear change
lever.
Add gear oil.
Gear oil quantity: 750c.c.
Position mark
Dowel pins
9 bolts
Summary of Contents for VECTOR 250 - SERVICE
Page 114: ...114 Handle bar...
Page 128: ...128 REAR BRAKE...
Page 149: ...149...
Page 150: ...150 12 8 WIRING DIAGRAM...