![EST Encon Evolution User Manual Download Page 52](http://html.mh-extra.com/html/est/encon-evolution/encon-evolution_user-manual_2429115052.webp)
4.4.2 Manual Heater Control
The heated zones, which consist of the Trap, MoRT, Sample (option), Mount (option),
Transfer Line and Valve Oven may be manually heated to a specific set point
temperature. <click> the temperature display box located next to the respective icon for
any given heated zone and the manual temperature control will appear as shown in Figure
4c.
NOTE: The system continuously monitors for over temperature conditions and will
provide a pop-up screen to alert of any over temperature problems.
Figure 4c: Setpoint Temperature screen (Sample Heater)
Current Temperature (
°
C) –
Displays the current temperature.
Setpoint
(
°
C) –
Enter the desired set point (SP) temperature.
Heat to SP -
<click> the
Heat to SP
button. The selected zone will heat to the entered
set point. The temperature will be maintained as selected until it is manually changed
again or a method is loaded.
CAUTION: Heating the trap or MoRT tube without flow may damage the trap
sorbent materials or the MoRT tube Silco treated surface.
ATTENTION: Le chauffage du piège ou MoRT tube sans écoulement peut
endommager les matériaux absorbants piège ou le tube MoRT Silco surface traitée.
CAUTION: Manual heating will not recognize maximum temperature set points
(see Operations chapter, Options screen, System Settings tab.)
ATTENTION: chauffage manuel ne reconnaît pas les points de consigne de
température maximale (voir chapitre des opérations, l'écran Options, onglet
Paramètres système.)
Summary of Contents for Encon Evolution
Page 1: ...Encon Evolution User Manual Original Operating Instructions Rev 4 5 ...
Page 2: ......
Page 8: ...User Manual Introduction Chapter 1 ...
Page 15: ...User Manual Installation and Setup Chapter 2 ...
Page 20: ...User Manual Operation Chapter 3 ...
Page 47: ...User Manual Maintenance and Troubleshooting Chapter 4 ...
Page 61: ...User Manual Flow Diagrams Chapter 5 ...
Page 62: ...Figure 5 1 Standby Dry Purge Flow Diagram ...
Page 63: ...Figure 5 2 Purge Flow Diagram ...
Page 64: ...Figure 5 3 Desorb Ready Flow Diagram ...
Page 65: ...Figure 5 4 Desorb Flow Control Flow Diagram ...
Page 66: ...Figure 5 5 Desorb Auto Drain Flow Diagram ...
Page 67: ...Figure 5 6 Desorb Flow Diagram ...
Page 68: ...Figure 5 7 Bake with Bake Gas Bypass Flow On Flow Diagram ...
Page 69: ...Figure 5 8 Bake with Bake Gas Bypass Flow Off Flow Diagram ...
Page 70: ...Figure 5 9 Leak Check Flow Diagram 1 ...
Page 71: ...Figure 5 10 Leak Check Flow Diagram 2 ...
Page 72: ......