![EST Encon Evolution User Manual Download Page 31](http://html.mh-extra.com/html/est/encon-evolution/encon-evolution_user-manual_2429115031.webp)
Mount Temperature (
°
C) –
(OPTION) – This is the temperature of the sample mount.
This parameter can be set to a temperature between 35°C and 100°C in 1°C increments
using the up/down arrows.
Auxiliary Temperature (
°
C) –
(OPTION) – This is the temperature of the auxiliary
heater. This parameter can be set to a temperature between 35°C and 350°C in 1°C
increments using the up/down arrows.
Figure 3h: Method screen – Purge & Trap tab
3.10.2 Purge & Trap tab
- <click> the
Purge & Trap
tab. The screen will appear as shown in
Figure 3h. This tab contains the parameters for the operation of the concentrator in its
various modes: ready, purge, dry purge, desorb and bake.
Trap Ready Temperature (
°
C) –
This is the temperature the adsorbent trap must reach
before going to purge ready status.
The adsorbent trap will continue to cool (free fall)
after reaching the set point. The adsorbent trap ready temperature can be programmed to
a value of 25°C to the maximum set point, in 1°C increments.
MoRT Ready Temperature (
°
C) –
This is the temperature the MoRT (Moisture
Reduction Trap) trap must reach before going to purge ready status. When the MoRT
tube temperature is set to 40°C or above the Encon EV will maintain that temperature. If
the temperature is set below 40°C the MoRT tube will continue to cool (free fall) after
reaching the set point. The MoRT tube ready temperature can be programmed to a value
of 25°C to the maximum set point, in 1°C increments.
Summary of Contents for Encon Evolution
Page 1: ...Encon Evolution User Manual Original Operating Instructions Rev 4 5 ...
Page 2: ......
Page 8: ...User Manual Introduction Chapter 1 ...
Page 15: ...User Manual Installation and Setup Chapter 2 ...
Page 20: ...User Manual Operation Chapter 3 ...
Page 47: ...User Manual Maintenance and Troubleshooting Chapter 4 ...
Page 61: ...User Manual Flow Diagrams Chapter 5 ...
Page 62: ...Figure 5 1 Standby Dry Purge Flow Diagram ...
Page 63: ...Figure 5 2 Purge Flow Diagram ...
Page 64: ...Figure 5 3 Desorb Ready Flow Diagram ...
Page 65: ...Figure 5 4 Desorb Flow Control Flow Diagram ...
Page 66: ...Figure 5 5 Desorb Auto Drain Flow Diagram ...
Page 67: ...Figure 5 6 Desorb Flow Diagram ...
Page 68: ...Figure 5 7 Bake with Bake Gas Bypass Flow On Flow Diagram ...
Page 69: ...Figure 5 8 Bake with Bake Gas Bypass Flow Off Flow Diagram ...
Page 70: ...Figure 5 9 Leak Check Flow Diagram 1 ...
Page 71: ...Figure 5 10 Leak Check Flow Diagram 2 ...
Page 72: ......