![EST Encon Evolution User Manual Download Page 19](http://html.mh-extra.com/html/est/encon-evolution/encon-evolution_user-manual_2429115019.webp)
2.5.2 Monitor
Connection
Mount the monitor to the post and tighten the mounting bracket to the hold down post
screw. Plug the VGA cable to the VGA port on the bottom of the monitor. Plug power
cable to the 24 VDC port on the back of the monitor. Note: If optional touch screen
monitor is purchased an additional a 9 pin cable will be included to connect to the
monitor.
2.5.3 Mouse
Connection
Place the mouse on the bench and run the cable under the Encon Evolution and out the
back of the instrument. Plug the mouse into the USB connector labeled “Mouse”.
2.5.4 Gas Connections
Pressurization Gas
Connect the 1/8” helium line to the bulkhead of the
Encon Evolution and set the tank pressure between 60-80 psi (414-552kPa).
Carrier Gas
Connect the carrier gas line of the Encon Evolution to the union at the cut in carrier gas
pathway of the gas chromatograph. The heated transfer line will connect to the other end
of the cut in the carrier gas line pathway that is closest to the inlet.
WARNING: The transfer line is heated and needs to be installed so as to keep a
minimum of 10 inches between the transfer line and any adjacent cables or objects.
AVERTISSEMENT: La ligne de transfert est chauffé et doit être installé de manière
à maintenir un minimum de 25.4 cm entre la ligne de transfert et les câbles ou les
objets adjacents.
2.5.5 Power Connection
Plug power cord into the power entry module located on the back of the Encon
Evolution.
WARNING: Ensure proper grounding of the Encon Evolution system before
powering the system up.
AVERTISSEMENT: S'assurer de la bonne mise à la terre du système Encon
Evolution avant de mettre le système en place.
2.5.6 System Power Up
The Encon Evolution is ready for power cycle. Turn on the Encon Evolution and follow
the Encon Evolution Installation checklist below. The power switch is located in the rear
right side of the unit.
NOTE: EST strongly recommends you familiarize yourself with the rest of the
manual before proceeding to the installation checklist. If you have any questions
regarding installation please do not hesitate to call EST Analytical at (800) 283-3510
or (
513) 642-0100, or your local authorized dealer.
Summary of Contents for Encon Evolution
Page 1: ...Encon Evolution User Manual Original Operating Instructions Rev 4 5 ...
Page 2: ......
Page 8: ...User Manual Introduction Chapter 1 ...
Page 15: ...User Manual Installation and Setup Chapter 2 ...
Page 20: ...User Manual Operation Chapter 3 ...
Page 47: ...User Manual Maintenance and Troubleshooting Chapter 4 ...
Page 61: ...User Manual Flow Diagrams Chapter 5 ...
Page 62: ...Figure 5 1 Standby Dry Purge Flow Diagram ...
Page 63: ...Figure 5 2 Purge Flow Diagram ...
Page 64: ...Figure 5 3 Desorb Ready Flow Diagram ...
Page 65: ...Figure 5 4 Desorb Flow Control Flow Diagram ...
Page 66: ...Figure 5 5 Desorb Auto Drain Flow Diagram ...
Page 67: ...Figure 5 6 Desorb Flow Diagram ...
Page 68: ...Figure 5 7 Bake with Bake Gas Bypass Flow On Flow Diagram ...
Page 69: ...Figure 5 8 Bake with Bake Gas Bypass Flow Off Flow Diagram ...
Page 70: ...Figure 5 9 Leak Check Flow Diagram 1 ...
Page 71: ...Figure 5 10 Leak Check Flow Diagram 2 ...
Page 72: ......