2
SmartEdge 1200 Router Hardware Guide
10/100 Ethernet straight cable, A-7
Craft console cable, A-2
Ethernet management port, crossover cable, A-2
Ethernet management port, straight cable, A-3
external timing cable, A-4
FE-GE breakout cable, A-7
power, connecting, 4-36
required for installation, 3-14
routing, at front of chassis, 4-31
specifications
10/100 Ethernet cards, A-5
ATM cards, A-5
FE-GE cards, A-5
Gigabit Ethernet cards (transceiver-based), A-8
management access cables, A-1
OC-192c/STM-64c cards, A-9
system management cables, A-3
cable tray, installing, 4-18
cards
adding, environment, 6-1
connecting cables, 4-31
installing
procedure, 4-21
slot restrictions, 6-17
torque required, 4-22
LED types, 5-4
listed, 2-2
repairing, restriction, 6-2
replacing, environment, 6-1
servicing, restriction, 6-2
slot assignments, 4-20
specifications
10/100 Ethernet cards, 2-8
10GE cards, 2-14
ATM OC-12c/STM-4c cards, 2-4
ATM OC-3c/STM-1c cards, 2-6
FE-GE cards, 2-8
GE1020 cards, 2-13
GE3 cards, 2-11
GE cards, first version, 2-10
GE cards, second version, 2-10
OC-192c/STM-64c cards, 2-16
centered mount, 3-10
CF ACTIVE LEDs, XCRP, XCRP3 controller cards, 5-5
CF cards
described, 1-10
determining status, 5-5
installing, 6-12
removing, 6-14
CF LEDs, XCRP4 controller cards, 5-5
chassis
cooling requirement, 1-6
described, 1-5
installing
blank cards, 4-22
cable connections, 4-31
cards, 4-19
chassis ground cable, 4-14
in a rack, 4-10
mounting brackets, 4-7
mounting positions, 4-6
planning, 3-10
power cables, 4-16
RU requirements, 4-5
tasks, 4-4
torque required, 4-10
power data, operating and inrush current, 3-4
specifications, 3-6
chassis ground cable, torque required, 4-15
clocks, described
onboard controller cards, 1-9
RTC, 1-9
system, 1-9
time-of-day, 1-9
connectors
cards, 3-8
chassis ground cable, 4-15
power cables, 4-16
specifications, 3-8
traffic card restrictions, 3-8
console port
description, 3-13
label for, 3-13
terminal for, 3-13
controller cards
active, at initial power on, 4-20
adding, 6-8
CF cards
installing, 6-12
removing, 6-14
compared, 1-7
determining slot with active controller card, 5-5
equipment LEDs, 5-5
facility LEDs, 5-6
for default active controller card, 5-5
installing
procedure, 4-21
slot restrictions, 6-17
torque required, 4-22
LEDs illustrated, 5-5
memory supported, 1-9
redundancy, 1-11
replacing, 6-10
slot assignments, 4-20
slot at initial power on, 4-28
slot restrictions, 1-7
synchronization and external timing LEDs, 5-6
upgrading, 6-12