![epur OAKBOT EOX 4.2 Series User Manual Download Page 47](http://html1.mh-extra.com/html/epur/oakbot-eox-4-2-series/oakbot-eox-4-2-series_user-manual_2420302047.webp)
epur | USER’S MANUAL
www.epur.io - - | 47 | - - [email protected]
3.
Once the whole clamping process is over, make a final check to see that the
clamps are properly tightened and that locking between the OAKBOT and its
clamping module is correct.
Your OAKBOT is now ready to carry out machining.
/!\ CAUTION /!\
Any faulty handling during these phases may result in risks to the operator, machine
and the environment,
in which case, the EPUR SAS Company shall not be held
responsible.
/!\ CAUTION /!\
Once the whole clamping process is over, carry out a final check to see that clamps
are properly tightened and that locking between the OAKBOT and its clamping module
is correct. Poor application of these instructions may result in risks to the
operator, machine and the environment
in
which case, the EPUR SAS Company shall
not be held responsible.
Summary of Contents for OAKBOT EOX 4.2 Series
Page 1: ...DOCUMENT epur User s Manual OAKBOT EOX series 4 2 Original Manual...
Page 7: ...epur USER S MANUAL www epur io 7 contact epur io Machining Module Mass 35 kg...
Page 10: ...epur USER S MANUAL www epur io 10 contact epur io Calibration tool Clamps...
Page 36: ...epur USER S MANUAL www epur io 36 contact epur io...
Page 50: ...epur USER S MANUAL www epur io 50 contact epur io...